From
the slab to
the finished floor
Flooring work often gets split across two or three trades — one strips the old covering, one preps the slab, another lays the finish. That works fine, but it leaves you coordinating the handovers and holding three separate quotes.
We do all three. The tiles come up, the slab is taken back to the profile the coating specifies, and the finish goes down, with the same team accountable for the lot. If the substrate turns out to be a problem, you hear about it while it can still be fixed rather than after the coating is down.
It also means our preparation gets the time it needs, because we're the ones who have to bond to it afterwards.


















