Our Prices

WHAT IS THE COST TO REMOVE CARPET?

  • $25 / Per m2

    Will require grind to remove glue (additional cost)

  • $11 / Per m2

    These prices do not include concrete grinding to remove any leftover glue or bedding additional cost will apply, please see concrete grinding for costing.

WHAT IS THE COST TO REMOVE HYBRID FLOORING?

  • $22 / Per m2

  • $19 / Per m2

    Floating flooring removal will cost $19 per m2 to remove

  • $35 per m2

The prices vary depending on the size of the job as well as how the Hybrid Flooring was installed. For most small residential jobs we charge:

WHAT IS THE COST TO REMOVE STENCIL CONCRETE?

The prices vary depending on the size of the job as well as how the many layers of stencil concrete was installed. For most small residential jobs we charge:

  • $35 – $60 / per m2

  • $60 – $90 / per m2

WHAT IS THE COST TO REMOVE VINYL?

Remove Vinyl Flooring at a cost of $11 – $21 / per m2. Vinyl Planks, Vinyl Sheets, and Vinyl Tiles are all priced at $11 – $21 / per m2 to remove, the prices only vary due to the size of the job.

  • $11 – $21 / per m2

    To remove vinyl tiles, vinyl planks, or vinyl sheets that were glued to the floor.

  • $11– $21 / per m2

    To remove LAYER #1 + $10 per m2 to remove any additional layers.

  • $40 / per m2

    To remove vinyl that has underlay. Such as masonite, chipboard, MDF, etc.

These prices do not include concrete grinding to remove any leftover glue or bedding additional cost will apply, please see concrete grinding for costing.

HOW MUCH DOES IT COST
TO REMOVE ROOFTOP WATERPROOFING?

The cost to remove a waterproofing membrane can vary quite a lot depending on a few factors:
– What the waterproofing membrane is made of
– How many square meters there is to be removed
– How thick the membrane is

  • $40 – $50 / per m2

    These are fairly easy to remove

  • $50 – $60 per m2

    These are very hard to remove

WHAT IS THE COST TO REMOVE TILES?

$40 – 70 per m2

  • – Glued

  • – Screed
    – Cement
    – Sand and Cement Bedding

  • – Sand and Cement Bedding
    – Cement Sheeting
    – Glue + Wire Mesh
    – Screed + Wire Mesh
    – Cement + Wire Mesh
    – Sand and Cement + Wire Mesh
    – Glued to Screed
    – Glued to Cement Bedding
    – Glued to Sand and Cement Bedding

  • – Glued to Sand and Cement Bedding

These prices don’t include concrete grinding to remove any leftover glue or bedding. Additional cost will apply, please see concrete grinding for costing. 

HOW MUCH DOES CONCRETE GRINDING COST PER METRE?

Depending on what the desired outcome of “the Grind” is weather it be a general grind to apply an epoxy coating system or a heavy grind to remove glues or toppings.

The prices vary depending on the size of the job.

$7 – $25 per m2 depending on the size of the area, access, destination etc

HOW MUCH DOES SHOTBLASTING COST PER SQUARE METRE?

$15 – $60 Per m2

  • Shot blasting concrete is an effective method in preparing a concrete floor before applying a coating or overlay. It uses a machine that propels steel shot at the surface to create a roughened texture that improves adhesion. Shot blasting concrete is an affordable and fast option of prep. Shot blasting is also the preferred method of prep of most coatings manufacturers as it produces excellent bonding characteristics to concrete and steel alike.

    • Fast effective concrete prep for overlays and some thicker coating systems

    • Speed up prep time on really hard concrete floors

    • Finds weakness in the surface layer of the concrete 

    • Best method of prep for ship decks prior to installation of coating system